← Về thư mục
📄 / / profiles / r-and-d / raw_evidence / scientific-agent-skills / skills / iso-standards-readiness / references / assurance-lanes.md

Assurance Lanes: What Each One Actually Decides

Research basis: 2026-07-26. Read this before preparing evidence for any standard in this skill. Most substantive errors in readiness work are lane confusion, not missing documents: an output that is correct for one lane is wrong, and sometimes a false claim, in another.

Every lane below is decided by a different body, against a different basis, producing a different artifact with a different scope. None of them is a substitute for another, and this skill produces none of them.

The seven lanes

Lane Who decides Basis Artifact Applies to
Management-system certification Certification body under ISO/IEC 17021-1 Authorized standard + certification scheme Certificate, scoped ISO 13485
Laboratory accreditation Accreditation body under ISO/IEC 17011 Authorized standard + scheme rules Accreditation + scope schedule ISO/IEC 17025, ISO 15189
Regulator inspection National regulator That jurisdiction's law Inspection outcome, enforcement FDA QMSR, CLIA, national regimes
Mandatory certification/licensure Government or its agent Statute Certificate/licence to operate CLIA
Regulatory audit programme Recognized Auditing Organization Programme audit model Audit report used by participating regulators MDSAP
Conformity assessment Notified body / manufacturer per route Product regulation Product certificate, declaration of conformity EU MDR/IVDR
Assessed-inside-another-lane Whoever runs the host lane The standard, as evidence No artifact of its own ISO 14971

Certification and accreditation are not synonyms

This is the most frequent wording error in readiness documents.

"ISO 17025 certified" and "ISO 15189 certified" are category errors. So is treating an accreditation schedule as if it covered the whole organization: an accreditation scope is per location and per activity or examination, and work outside it must carry no accreditation claim.

Since 2026-01-01, Global Accreditation Cooperation Incorporated has replaced the former ILAC and IAF and operates a single Multilateral Recognition Arrangement. Certificates and accredited results issued under the former IAF MLA / ILAC MRA remain recognized during the transition. Before reproducing any recognition claim, logo, or document designation, verify the current wording — legacy phrasing may be transitional rather than current.

A certificate never displaces a regulator

Hold these apart in every output:

What a scope statement limits

Whatever the lane, the artifact is bounded. Record the boundaries explicitly, because a claim that quietly exceeds them is the failure mode:

Product- and jurisdiction-specific controls sit outside all of this

Classification, intended purpose and claims, software and cybersecurity, clinical or performance evidence, biocompatibility, electrical safety, sterilization, UDI, registration, personnel qualification, reporting, and payer conditions each require separate authorized analysis. A management-system or laboratory-competence readiness output says nothing about any of them.

Lane declaration is a required input, not an inference

Before evidence work starts, name the lane or lanes in the intake, with an owner for each applicability decision. The bundled checks record what humans declared; they never infer a lane from a document set. Where a lane is undetermined, the intake check raises HUMAN_DECISION_REQUIRED as a blocker — leave it as a blocker.

Manifest audit_context.purpose accepts one declared purpose per manifest: internal-audit, iso-certification-readiness, accreditation-assessment-readiness, fda-inspection-readiness, national-regulatory-inspection-readiness, mdsap-audit-readiness, or eu-conformity-assessment-readiness. Preparing for two lanes means two manifests with two scopes and two sets of limitations, not one manifest with a blended purpose.

Titling rule

Never title an output "certificate," "accreditation," "compliance report," "audit pass," "deemed status," or "ready for inspection." Use Draft evidence review for authorized human assessment, and state which lane the evidence was prepared for.

Sources