← Về thư mục
📄 / / profiles / r-and-d / raw_evidence / scientific-agent-skills / skills / iso-standards-readiness / assets / templates / procedures / document-control-procedure-template.md

Document and Record Control Procedure Working Template

STATUS: DRAFT EXAMPLE — NOT APPROVED — NO COMPLIANCE CLAIM

This structure is not a released procedure. It does not determine retention, regulatory applicability, conformity, or certification. Authorized management, RA/QA, legal/regulatory, process owners, and document control must approve the organization-specific controls. ISO publications are copyrighted; use an authorized copy and do not paste their text here.

Controlled-document metadata

Field Entry
Document ID/revision <ID> / <revision>
Owner <accountable role>
Status draft / in-review / approved
Effective date <YYYY-MM-DD after approval>
Evidence repository <controlled location>
Change/superseded record <IDs>
Approval role Named approver Status Date Approval evidence
Process owner <name/role> pending <date> <ID>
RA/QA <name/role> pending <date> <ID>
System owner <name/role> pending <date> <ID>

1. Purpose, scope, and interfaces

2. Roles and segregation of duties

Role Authority/responsibility Independence or access restriction Delegate Evidence Approval
Document owner <entry> <entry> <role> <ID> <ID>
Record owner <entry> <entry> <role> <ID> <ID>
Reviewer <entry> <entry> <role> <ID> <ID>
Approver <entry> <entry> <role> <ID> <ID>
System administrator <entry> <entry> <role> <ID> <ID>

3. Document lifecycle

Stage Required controls Owner Status Evidence Approval
Request/authoring need, scope, source/version, author <role> draft <ID> <ID>
Review technical, process, RA/QA, linked-document impact <role> draft <ID> <ID>
Approval/release named authority, date, revision, effective date <role> draft <ID> <ID>
Distribution/use access, point-of-use revision, copy status <role> draft <ID> <ID>
Change rationale, impact, validation/training, linked updates <role> draft <ID> <ID>
Obsolescence withdrawal, archive, retained-copy identification <role> draft <ID> <ID>

Define approved rules for identifiers, revision schemes, emergency changes, printed copies, translations, electronic signatures, and controlled exports. Do not assume that a downloaded or printed file remains controlled.

4. Record lifecycle and data integrity

Control Organization-specific method Owner Status Evidence Approval
Creation/attribution <entry> <role> draft <ID> <ID>
Legibility/completeness <entry> <role> draft <ID> <ID>
Contemporaneous entry <entry> <role> draft <ID> <ID>
Corrections/audit trail <entry> <role> draft <ID> <ID>
Access/security <entry> <role> draft <ID> <ID>
Backup/recovery <entry> <role> draft <ID> <ID>
Retrieval <entry> <role> draft <ID> <ID>
Retention/disposition <entry> <role> draft <ID> <ID>

Retention periods must cite an approved basis for each record type. This template does not supply a universal period.

5. External source and version control

Source ID Publisher/title Version/date Authorized location Applicability owner Last currency review Impact record Status Approval
<ID> <entry> <entry> <entry> <role> <date> <ID> review-due <ID>

Required controls:

  1. Obtain standards from an authorized source and preserve license restrictions.
  2. Record the exact edition/version incorporated into each jurisdictional basis.
  3. Monitor official publishers; do not rely on search snippets as controlled text.
  4. Perform and approve impact assessment before changing QMS documents.
  5. Distinguish ISO, FDA QMSR/eCFR, MDSAP, EU MDR/IVDR/MDCG, and product-specific sources rather than treating them as interchangeable.

6. Electronic systems and software validation

System/use Intended use Risk basis Access/audit-trail controls Validation evidence Change/revalidation trigger Owner Approval
<system> <entry> <entry> <entry> <ID> <entry> <role> <ID>

Do not release an electronic workflow until authorized owners approve intended use, validation evidence, access roles, data migration, backup/recovery, and change controls.

7. Change and training impact

Every change record should include:

8. Registers and audit evidence

Register Owner Status Location Review frequency/basis Evidence Approval
Master document list <role> draft <location> <basis> <ID> <ID>
Record retention schedule <role> draft <location> <basis> <ID> <ID>
External source ledger <role> draft <location> <basis> <ID> <ID>
Access/role register <role> draft <location> <basis> <ID> <ID>
Training/change register <role> draft <location> <basis> <ID> <ID>
Obsolete/disposition log <role> draft <location> <basis> <ID> <ID>

Release checklist